Utility company I use to work with had a policy of 20% call out and I believe 25% scheduled overtime. Pretty easy to reach those goals. 75% sounds a little ridiculous. The worst was JCP&L in NJ having their guys on a 100% call out required. Thank God those boys had the balls to stick up for themselves and fight back.